Die Casting vs. CNC Machining: Choosing the Right Process for Mid-Volume Production
At 5,000–50,000 units a year, the right process isn't obvious. Here's the framework we walk customers through before quoting either way.
Low volumes point to machining. High volumes point to casting. The mid-volume band in between is where most of our sourcing conversations actually happen, and where the wrong call is most expensive.
Tooling amortisation is the first number to run
A die-cast tool can cost more than a year of machining time on the same part. Below roughly 8,000-10,000 units annually, that tooling investment rarely pays back inside a typical program life.
Geometry changes the answer
Thin, ribbed, or highly cored geometries that are difficult to machine economically often favour casting even at lower volumes, because the alternative is expensive multi-axis roughing just to remove material a die would have never put there.
- Under ~8,000 units/year: CNC machining almost always wins on total cost
- 8,000–30,000 units/year: depends heavily on geometry and tolerance bands
- 30,000+ units/year: die casting typically wins unless tolerances are very tight
- Frequent design revisions favour machining — no tool to rework
We run this comparison on every quote that sits in the mid-volume range, and we'll tell a customer directly when machining is the cheaper, faster path — even if it means a smaller casting order for us.
Keep Reading
Related Resources
Blog
5 Ways to Reduce CNC Cycle Time Without Sacrificing Tolerance
Cycle time and tolerance don't have to trade off against each other. Here's where our machining team actually finds the difference.
Blog
A Practical Guide to Surface Finish Callouts on Machining Drawings
Ra values get specified more often than they're understood. A short, practical guide to what surface finish callouts actually control.
Case Study
Cutting Lead Time 38% for a Tier-1 Automotive Bracket Program
A Tier-1 automotive supplier needed a second source for a structural bracket family with an aggressive ramp schedule. Here's how the program went from quote to full-rate production.