A Tier-1 automotive supplier needed a second source for a structural bracket family with an aggressive ramp schedule. Here's how the program went from quote to full-rate production.
The challenge
A Tier-1 automotive component supplier needed a qualified second source for a family of structural brackets, with a ramp schedule that left little room for a slow first-article process. Their existing supplier's lead times were putting a vehicle program launch date at risk.
What we did
Our tool room built dedicated fixturing in parallel with the customer's PPAP documentation review, rather than waiting for sign-off to start. First articles were machined, measured on our CMM, and submitted within three weeks of drawing receipt.
38%
Lead time reduction vs. incumbent
0
PPAP rejections on submission
6 weeks
Quote to full-rate production
“We needed a second source that could move at the speed of our launch schedule, not the speed of a typical qualification cycle. That's exactly what we got.”
— Program Manager, Tier-1 Automotive Supplier
Result
The program is now in full-rate production across two bracket variants, with the customer's engineering team citing the parallel tooling and qualification approach as the main driver of the timeline recovery.
Keep Reading
Related Resources
Case Study
Scaling Die-Cast Housing Production for an EV Battery Component Line
An EV component manufacturer needed to scale battery housing production from prototype volumes to several thousand units a month without a quality dip.
Case Study
Requalifying a Legacy Aerospace Bracket to AS9100 Tolerances
A 15-year-old bracket design needed to be requalified under current AS9100 documentation standards without changing the part's form, fit or function.
Blog
5 Ways to Reduce CNC Cycle Time Without Sacrificing Tolerance
Cycle time and tolerance don't have to trade off against each other. Here's where our machining team actually finds the difference.