Built for STS at Scale
50,000 sq. ft. of manufacturing floor, machine shop, warehouse and in-house laboratory — everything a program needs, under one roof.
Manufacturing Facility
50,000 Sq. Ft., Four Dedicated Units
50,000
Total sq. ft. facility
4
Dedicated production & lab units
3
Shifts running daily
2023
Current facility completed
Machining Floor
3-, 4- and 5-axis CNC machining centers and CNC turning cells running across three shifts.
Fabrication & Die Casting Bay
Fiber laser, CNC press brakes, welding cells and high-pressure die-casting lines.
Quality Laboratory
Climate-controlled CMM, metrology and material testing lab, separate from the production floor.
Raw Material & Finished Goods Warehouse
Segregated raw material, WIP and finished goods storage with full batch tagging.
Machinery
50+ Machines on the Floor
5-Axis CNC Machining Centers
Simultaneous 5-axis capacity for complex, thin-walled geometries.
3- & 4-Axis VMCs
General-purpose milling for prismatic components.
CNC Turning Centers
Twin-spindle lathes for high-volume turned parts.
High-Pressure Die-Casting Lines
Aluminium and zinc alloy casting cells.
Fiber Laser Cutting
Sheet metal cutting up to 12mm thickness.
CNC Press Brakes
Programmed bend sequences for fabricated parts.
Robotic Welding Cells
Automated MIG welding for structural assemblies.
Injection Moulding Machines
50–250 ton clamping force range.
Technology
Software & Systems Behind the Floor
CAD/CAM Software
SolidWorks, NX and Mastercam for design, toolpath programming and DFM review.
ERP-Driven Production Planning
Real-time job tracking, material planning and delivery scheduling across every order.
In-Process Data Logging
SPC data captured directly from CNC and inspection equipment, not entered by hand.
Digital First-Article Records
FAIR reports and material certificates stored digitally and retrievable per batch.
R&D Center
Prototyping That Doesn't Wait for a Tool
Every new part goes through a DFM review and rapid prototype cycle before it's quoted for production — so design issues surface before tooling, not after.
24–48h
Typical prototype turnaround
3
Design iterations, avg. before tool cut
100%
DFM review before quoting
Capacity
Built to Scale With Your Program
Three shifts, six days a week, across every capability — so ramping from prototype to full-rate production doesn't mean re-sourcing to a different supplier.
50+
Advanced machines on the floor
200+
Skilled production & engineering staff
3
Shifts, 6 days a week
50,000+
Units/month peak capacity
Let's Build Something
Ready to Start Your Next Program?
Send us your drawing, requirement or a rough sketch — our engineering team responds with a real quote, not a form letter.